Wednesday, July 23, 2008


This was taken on June 26, 2008. We had mostly framed the front two dormers. The sheetrock is stacked in the right door and the insulation (blow-in) is in the left). Most of the framing at that point was being done upstairs, so we would pass the lumber (stacked on the concrete) up through the left dormer. I still can't get over how much wood is used to build this garage/shop. I underestimated by over half.

No comments: